Settings that affect scheduling
Administrators can review scheduling settings in System > Settings. Values belong to your tenant; check the current settings rather than relying on a help example.
- Days before program change applied
- Controls the delay before a program change applies to future scheduling.
- Default scheduled test duration, in days
- Supplies the initial duration for a new test series. Review Duration when creating the series.
- Tolerance, in days, for entering results or taking samples
- Controls the allowed timing tolerance when recording task completion.
- Allow results in future
- Determines whether future-dated results or samples are allowed.
- Enforce sampling
- Controls whether sampling requirements are enforced.
Example: program-change delay
If the configured delay is three days, relevant sample-definition parameter changes apply to eligible tasks after the resulting effective time. Tasks inside that period and already submitted results are not simply rewritten. Inspect the Program changed event and future tasks to confirm the actual effect.
Duration and timing
The default duration supplies a starting value; edit it for a weekly or multi-day calculation. Future-result permission and timing tolerances determine whether a sample/result time is accepted. Enforce sampling can require the associated sampling work before result submission.